Tesla, ChargePoint, Wallbox, JuiceBox, Grizzl-E, and every other Level 2 charger brand. Sized to your vehicle, permit pulled, installed in one day. Across the Greater Boston area and the South Shore.
“Micah did an incredible panel swap, upgrading a 40-year old Siemens load center to a new Span smart panel.” — Kenny G., Google review
Quick form, then pick a time on Micah's calendar. He'll call at the selected time to confirm the project and provide a quote.
By submitting, you agree we may contact you by phone or email about your request. See our privacy policy and terms.
Trouble with the calendar? Call Micah directly at (508) 622-5919 or text him.
“Micah did an incredible panel swap, upgrading a 40-year old Siemens load center to a new Span smart panel.” — Kenny G., Google review
Quick form, pick a time
Fill in the quick form, then pick a time on Micah's calendar.
Micah calls with a quote
He calls at the time you picked to confirm the project and provide a quote. Most quote requests are returned within 24 hours.
Permit pulled, work done
The same licensed electrician handles the job from quote to inspection. Permits pulled, no subs, no call center.
Inspection coordinated
We coordinate the inspection with the local town wiring inspector.
You bought the EV. The dealership recommended a Level 2 charger. Now your electrician needs to install it — and most installs get one of three things wrong.
First, the circuit has to match your specific vehicle. A Tesla Model Y, a Ford Lightning, and a Chevy Bolt all pull different amperage. Installing a generic 40A circuit when your truck wants 48A means slower charging or a tripping breaker every time the battery's near empty.
Second, your existing electrical panel has to handle the load. Most older homes in Massachusetts weren't sized for an EV charger plus a heat pump plus the dryer running simultaneously. We run a load calculation BEFORE the install — not after the first time everything trips at 6pm on a Tuesday.
Third, the wire run matters. Long runs need bigger conductors to avoid voltage drop. Basement panel to a detached garage charger isn't a 30-foot run, it's an 80-foot run with code-mandated wire sizing. We pick the right wire for the actual distance, not the easy one.
Permit is pulled, inspection coordinated, and most Level 2 installations complete in one day. Every install is performed to current Massachusetts Electrical Code (527 CMR 12, NEC 2023).
Full upgrades from 100A to 200A or 400A. Federal Pacific and Zinsco replacements brought up to current MA code. Permits pulled, inspections coordinated.
View serviceRough-in through trim. Load planning done up front so the system supports what you're actually running. Coordination with GCs, framers, and inspectors.
View serviceChandeliers, ceiling fans, recessed cans, vanity lights, floodlights, security lighting, landscape lighting. Weatherproof installs with outdoor-rated wiring.
View serviceBased in Taunton, serving every town within roughly a 45-minute drive — across the Greater Boston area and the South Shore.